• Wholesales Pex Manifold Bracket Manifolds Mounting Brackets
  • Wholesales Pex Manifold Bracket Manifolds Mounting Brackets
  • Wholesales Pex Manifold Bracket Manifolds Mounting Brackets
  • Wholesales Pex Manifold Bracket Manifolds Mounting Brackets
  • Wholesales Pex Manifold Bracket Manifolds Mounting Brackets
  • Wholesales Pex Manifold Bracket Manifolds Mounting Brackets

Wholesales Pex Manifold Bracket Manifolds Mounting Brackets

After-sales Service: on Line Service
Warranty: 2 Years
Certification: CE
Heating Type: Water Heating Systems
Usage: Underfloor Water Heating
Size: 1"
Customization:
Manufacturer/Factory
Gold Member Since 2023

Suppliers with verified business licenses

Zhejiang, China
  • Overview
  • Detailed Photos
  • Product Parameters
  • Installation Instructions
  • Hot selling products
  • Quality Control and Package
  • Working Process
  • FAQ
Overview

Basic Info.

Model NO.
ODM
Color
Nickle Plated
Material
Steel
Project Solution Capability
Others
Design Style
Modern
After-Sale Service
Online Technical Support
Name
Manifold Bracket
Function
Insulation
Type
Floor Heating Parts
Product Name
Manifold Mounting Brackets
Application
Underfloor Heating System
Transport Package
Ctns+Pallets
Specification
1", 1-1/4"
Trademark
OEM
Origin
Zhejiang, China
Production Capacity
900000 Piece/Pieces Per Month

Product Description

OEM and ODM Pex Manifold Bracket Manifolds Mounting Brackets

 

Wholesales Pex Manifold Bracket Manifolds Mounting Brackets

Detailed Photos

Wholesales Pex Manifold Bracket Manifolds Mounting Brackets

 Wholesales Pex Manifold Bracket Manifolds Mounting BracketsWholesales Pex Manifold Bracket Manifolds Mounting Brackets

 

 The distribution manifolds are designed for low-temperature hot water radiant panel heating systems.

 The distribution manifold equipped inculdes: supply manifold with manual internal hex detentor, return manifold with thermostatic control valve (wich is suitable changed into electro-thermal actuator), end unit , metal bracket.  

Product Parameters

 

 Technical date:

 Material: main pipe brass

 Medium: water(Max. percentage of glycol is 30%)

Operating pressure: PN16

Medium temperature:0-100 degree C

Connection: 1" , 1-1/4"

Main pipe thickness: 2.5mm-2.8mm

Outlet: 3/4"*18  

Adapter: 16*2.0mm  , 20*2.0mm

Distance between outlets:50mm

 

Installation Instructions

 

 Installation:

 First step:Before installation the flow manifold bar needs to be twisted around so the flow gauges are on top with the connections below(as per pictures) to do this loosen the securing screws, twist the bar to correct orientation and re-tighten the screw. The manifolds are packed in this way to protect the flow gauges whilst in transit.

 

Use the screws and plugs provided to mount the pre-assembled flow and return manifolds assembly to the ball (please ensure that the screws and plugs provided are appropriate for your wall construction,if not alternative suitable fixings should be used)

 

Wholesales Pex Manifold Bracket Manifolds Mounting Brackets

Second step:Make sure that the manifold is level and that it is high enough so that the pipes can be installed easily.

                                                         Wholesales Pex Manifold Bracket Manifolds Mounting Brackets

 

Third stept:Fit the blue handled 1" union ball valve to the return manifold and the red handle 1" union ball valve to the flow manifold.

 

 

   

Please note :The blanking plugs should be fitted on the drain/filling valve.The manifold is now ready to have the flow and return pipes and the UFHC temperature  control unit attached.

Ensure the tube is cut squarely and is not damaged.

After the installation is complete the identity stickers can be used (if desired), to identify which zone each loop of pipe serves.

 

                                

 

When initially filling the UFH heating system it is important to remove the air in the pipework.

In order to do this a hose should be connected to the upperfill valve and the bottom valve should be opened to allow the water to be flushed in to a bucket or drain.

First isolate all but one of the heating circuits by turning off the relevant decorators's caps.

Next flush out the open circuits with clean water until it runs freely from the bottom valve.Isolate this circuit and open the next one.

Repeat this until all circuits have been filled.Introduce any inhibitor or antifreeze at this stage.

 

Hot selling products

Wholesales Pex Manifold Bracket Manifolds Mounting Brackets

 

 

 

Quality Control and Package

 

 Wholesales Pex Manifold Bracket Manifolds Mounting Brackets

Working Process

Wholesales Pex Manifold Bracket Manifolds Mounting Brackets

 

 

 

FAQ

 

FAQ

 

Q1. Can I have a sample order for manifold or valve?

A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.

 

Q2. Do you have any MOQ limit for manifold and valve order?

A: Low MOQ, 1pc for sample checking is available.

 

Q3. How do you ship the goods and how long does it take to arrive?

A: We usually ship by sea. It usually takes 30days to arrive . Airline shipping also optional.

 

Q4. How to proceed an order for manifold and valve?

A: Firstly let us know your requirements or application. Secondly we quote according to your requirements or our suggestion. Thirdly customer confirms the samples and places deposit for formal order. Fourthly we arrange the production.

 

 

 

Back to the home page

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory
Registered Capital
100 RMB
Plant Area
>2000 square meters