Customization: | Available |
---|---|
After-sales Service: | Online Service |
Warranty: | 2 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The distribution manifolds are designed for low-temperature hot water radiant panel heating systems.
The distribution manifold equipped inculdes: supply manifold with manual internal hex detentor, return manifold with thermostatic control valve (wich is suitable changed into electro-thermal actuator), end unit , metal bracket.
Material Specification
NO. |
Part Name |
Material |
1 |
Main bar |
304 stainless steel |
2 |
Innner core |
Brass |
3 |
Connection |
Brass |
4 |
Bracket |
Nickel plated steel |
5 |
End unit |
Brass |
Technical date:
Material: main pipe 304stainless steel
Medium: water(Max. percentage of glycol is 30%)
Operating pressure: PN16
Medium temperature:0-100 degree C
Connection: 1" , 1-1/4"
Main pipe thickness: 2.5mm
Outlet: 3/4"*18
Adapter: 16*2.0mm , 20*2.0mm
Distance between outlets:50mm
ADVANTAGES:
Installation:
First step:Before installation the flow manifold bar needs to be twisted around so the flow gauges are on top with the connections below(as per pictures) to do this loosen the securing screws, twist the bar to correct orientation and re-tighten the screw. The manifolds are packed in this way to protect the flow gauges whilst in transit.
Use the screws and plugs provided to mount the pre-assembled flow and return manifolds assembly to the ball (please ensure that the screws and plugs provided are appropriate for your wall construction,if not alternative suitable fixings should be used)
Second step:Make sure that the manifold is level and that it is high enough so that the pipes can be installed easily.
Third stept:Fit the blue handled 1" union ball valve to the return manifold and the red handle 1" union ball valve to the flow manifold.
Please note :The blanking plugs should be fitted on the drain/filling valve.The manifold is now ready to have the flow and return pipes and the UFHC temperature control unit attached.
Ensure the tube is cut squarely and is not damaged.
After the installation is complete the identity stickers can be used (if desired), to identify which zone each loop of pipe serves.
When initially filling the UFH heating system it is important to remove the air in the pipework.
In order to do this a hose should be connected to the upperfill valve and the bottom valve should be opened to allow the water to be flushed in to a bucket or drain.
First isolate all but one of the heating circuits by turning off the relevant decorators's caps.
Next flush out the open circuits with clean water until it runs freely from the bottom valve.Isolate this circuit and open the next one.
Repeat this until all circuits have been filled.Introduce any inhibitor or antifreeze at this stage.
MAIN SERVICE
Pre-sale service
1. We have full stock and deliver within short time.
2. OEM and ODM order are accepted. Any kind of logo printing or design are available.
3. Good quality + Factory price + Quick Response + Reliable Service, is what we are trying best to offer you.
4. All of our products are produced by our professional workman and we have our high-work-effect foreign trade team, you can totally believe our service.
After you choose
1. We will count cheapest shipping cost and make invoice to you at once.
2. Check quality again, then send out to you at 1-2working day after your payment.
3. Email you the tracking no., and help to chase the parcels until it arrive you.
After-sale service
1. We are very glad that customers give us some suggestion for price and products.
2. If you have any question, pls contact us freely by E-mail or telephone.
FAQ
Q1. Can I have a sample order for manifold or valve?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q2. Do you have any MOQ limit for manifold and valve order?
A: Low MOQ, 1pc for sample checking is available.
Q3. How do you ship the goods and how long does it take to arrive?
A: We usually ship by sea. It usually takes 30days to arrive . Airline shipping also optional.
Q4. How to proceed an order for manifold and valve?
A: Firstly let us know your requirements or application. Secondly we quote according to your requirements or our suggestion. Thirdly customer confirms the samples and places deposit for formal order. Fourthly we arrange the production.