• Customization Pex Manifold Steel Bracket Mounting for Heating Manifold
  • Customization Pex Manifold Steel Bracket Mounting for Heating Manifold
  • Customization Pex Manifold Steel Bracket Mounting for Heating Manifold
  • Customization Pex Manifold Steel Bracket Mounting for Heating Manifold
  • Customization Pex Manifold Steel Bracket Mounting for Heating Manifold

Customization Pex Manifold Steel Bracket Mounting for Heating Manifold

Warranty: 3 Years
Heating Type: Water Heating Systems
Usage: Underfloor Water Heating
Size: 1"
Color: Nickle Plated
Material: Steel
Customization:
Manufacturer/Factory
Gold Member Since 2023

Suppliers with verified business licenses

Zhejiang, China
  • Overview
  • Product Description
  • Hot selling products
  • Quality Control and Package
  • Working Process
  • FAQ
Overview

Basic Info.

Model NO.
WD-8325
Project Solution Capability
Others
Design Style
Modern
After-Sale Service
Online Technical Support
Name
Manifold Bracket
Function
Insulation
Type
Floor Heating Parts
Product Name
Manifold Brackets
Application
Underfloor Heating System
Certificate
CE
Transport Package
Ctns+Pallets
Specification
1", 1-1/4"
Trademark
OEM
Origin
Zhejiang, China
Production Capacity
900000 Piece/Pieces Per Month

Product Description

Customization Pex Manifold steel Bracket Manifold  Mounting Bracket 

 

Customization Pex Manifold Steel Bracket Mounting for Heating Manifold

 

 Customization Pex Manifold Steel Bracket Mounting for Heating Manifold

 Customization Pex Manifold Steel Bracket Mounting for Heating Manifold

 
Product Description
Product Description
Material
steel 
Surface treatment
nickel plate
Nominal pressure
≤ 10bar
Name
maniflod mounting bracket
Thickness
3.5mm
Specifications
1"
 
 
 

 

 Installation:

 First step:Before installation the flow manifold bar needs to be twisted around so the flow gauges are on top with the connections below(as per pictures) to do this loosen the securing screws, twist the bar to correct orientation and re-tighten the screw. The manifolds are packed in this way to protect the flow gauges whilst in transit.

 

Use the screws and plugs provided to mount the pre-assembled flow and return manifolds assembly to the ball (please ensure that the screws and plugs provided are appropriate for your wall construction,if not alternative suitable fixings should be used)

 

Customization Pex Manifold Steel Bracket Mounting for Heating Manifold

Second step:Make sure that the manifold is level and that it is high enough so that the pipes can be installed easily.

                                                         Customization Pex Manifold Steel Bracket Mounting for Heating Manifold

 

Third stept:Fit the blue handled 1" union ball valve to the return manifold and the red handle 1" union ball valve to the flow manifold.

 

 

   

Please note :The blanking plugs should be fitted on the drain/filling valve.The manifold is now ready to have the flow and return pipes and the UFHC temperature  control unit attached.

Ensure the tube is cut squarely and is not damaged.

After the installation is complete the identity stickers can be used (if desired), to identify which zone each loop of pipe serves.

 

                                

 

When initially filling the UFH heating system it is important to remove the air in the pipework.

In order to do this a hose should be connected to the upperfill valve and the bottom valve should be opened to allow the water to be flushed in to a bucket or drain.

First isolate all but one of the heating circuits by turning off the relevant decorators's caps.

Next flush out the open circuits with clean water until it runs freely from the bottom valve.Isolate this circuit and open the next one.

Repeat this until all circuits have been filled.Introduce any inhibitor or antifreeze at this stage.

 

 

Hot selling products

HOT SELLING PRODUCTS 

 

Customization Pex Manifold Steel Bracket Mounting for Heating Manifold

Customization Pex Manifold Steel Bracket Mounting for Heating Manifold

Quality Control and Package

 

 Customization Pex Manifold Steel Bracket Mounting for Heating Manifold

Working Process

Customization Pex Manifold Steel Bracket Mounting for Heating Manifold

 

 

 

FAQ

 

 

Q1. Can I have a sample order for manifold or valve?

A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.

 

Q2. Do you have any MOQ limit for manifold and valve order?

A: Low MOQ, 1pc for sample checking is available.

 

Q3. How do you ship the goods and how long does it take to arrive?

A: We usually ship by sea. It usually takes 30days to arrive . Airline shipping also optional.

 

Q4. How to proceed an order for manifold and valve?

A: Firstly let us know your requirements or application. Secondly we quote according to your requirements or our suggestion. Thirdly customer confirms the samples and places deposit for formal order. Fourthly we arrange the production.

 

 

 

Back to the home page

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory
Registered Capital
100 RMB
Plant Area
>2000 square meters